The last few weeks have been concerned with the work required to get the Broadway signal box commissioned in November. A lot of testing is being carried out to ensure that all the mechanical and electrical safety systems are operational.
One problem that has arisen is that with the emergence of the platform 2 waiting room the visibility of all the northern end signals has been obscured from the signal box. It has therefore been necessary to install detectors on these 7 signals - four of which are ground signals.
Thankfully there have been sufficient spare connections in the cabling between the lineside cabinets and the signal box to accommodate this. Additional cabling has been installed up the signal posts to the detectors.
Here is a view looking north from the signal box without a signal in sight!
Here are some pictures of the signals with their detectors fitted
Because of lack of use we have been finding some of the signal wire pulley wheels have gone stiff or seized, so these have been removed and lubricated .
There has been a problem with the arms of one of the compensators below platform 2 fouling with the adjacent unit so we have raised it up by 3" using some 3" x 6" channel plus longer bolts. The holes in this have been pre-drilled using another compensator base casting as a jig.
Here Mike E is is connecting the new cables in the cabinet from the detectors on the direction indicator signal (nos 2 & 3) and the adjacent pair of ground signals (nos 10 & 12)
The lamps in all the signals at the north end of the station were checked and confirmed to be working.
There is still some work to do with a modification to the mechanical locking and finalising the acceptance lever system. And a lot of testing.
So plenty still to do including the eventual removal of the ground frame and reconnecting the point rodding for signal box operation.
Curly
Good to hear progress is happening. Too bad the P2 work made more work for you all.
ReplyDeleteThanks for the update. Looking forward to seeing the box in working order, and seeing the signals in visible use. Thanks for all the work put in by you all.
ReplyDeleteRegards, Paul.
Very interesting, would the original signal box and it's position had the same issue of not being able to see?
ReplyDeleteDoubtful, as the original box was on the Down side at the other end of the road bridge. The Down Home and Distant, plus the Up Advanced Starting would have been repeated, but the Up Starting would have been visible from the box.