Wednesday, 25 March 2026

Tidying Up

 Tuesday 24th March

Having successfully  completed the replacement of new cabling between CRC and Bishops Cleeve Station Road bridge - we have decided today to tidy up trackside by removing the now redundant "coffin" joint enclosures . These are fairly substantial brick built structures which required a good bashing with a sledgehammer to break up

They have a tinplate metal cover held on with 4 stud bolts. Here's the before during and after:




All remaining visible cabling has been cut off and removed. We ended up with probably 1.5 tons of bricks and concrete to take back to Winchcombe for disposal. 

John P and myself did this while the rest of the team went back to Gotherington to complete the replacement and commissioning of the point motor




Curly


1 comment:

  1. "All remaining visible cabling has been cut off" - Are you just abandoning the buried part of the cable in place? With the price of scrap copper now, I hope someone doesn't come along and try and dig it up!

    ReplyDelete