Re-fitting CRC Point Motor

 Tuesday 17th Feb

Now that the replacement pointwork has been installed at CRC Hunting Butts, the point motor has to be put back in position, bolted down and re-connected.

This involves the drilling 4 20mm  dia holes through the sleepers and soleplate, fitting the spreader bars (the yellow one is brand new), and connecting the 3 detector bars. Ran out of time here so the adjustment and testing will have too be done another day.




A bit of a problem occurred in Winchcombe signal box this morning - the Winchcombe/Gotherington token broke in the token machine. The small end was eventually fished out and a spare one was found and the machine reset


All sorted before the first train appeared!

On Wednesday John P and John B installed lineside boxes at the CRC distant signal and at Bishops Cleeve Station Road bridge. Plenty of cable connecting planned for this weekend.

Curly