Tuesday 26th March
A good team out today in the diesel railcar ( avoiding the service trains I have to add!) to complete the jobs on the viaduct to enable the line to Broadway to be re-opened on Friday.
So...... with Neil C with the two John's P & B Peter B and myself we set off to the viaduct.
The main objective was to re-install the bonding wires at the rail joints (made easier now that there are several welded joints of 120ft lengths on this section).
First the drilling of the pairs of holes each side of the fish plates for the bonding wires with the motorised drill
Then a bit of ballast shovelling to create a channel to fit the protective yellow tubing for the connecting cables for the track circuits.