Tuesday, 26 May 2015

S & T at Toddington 26th May

Today's task was to install the levers and connect the demonstration signals
for the ex Wotton Under Edge box on the west side of Toddington car park.

John P with much cursing and scraped knuckles assembled the levers shackles
and signal wires to the frame which then took a 4 man lift to lower the assembly
Into position



Andy P, John P, Carl S, Malcolm W, Keith L & Mike S surveying a job well done - well
almost - still need to connect the ground signal once the concrete fixing block for the
pulley wheels has set. 

Great to see magnificent P & O glide past back to base while we were grafting!

Curly





2 comments:

  1. I enjoy reading your articles. You really have a wonderful blogs. Keep up the good work. Thank you also for the information!

    Yong
    www.gofastek.com

    ReplyDelete
  2. I really enjoyed reading your article. I found this as an informative and interesting post, so i think it is very useful and knowledgeable. I would like to thank you for the effort you have made in writing this article.


    edupdf.org

    ReplyDelete