tag:blogger.com,1999:blog-7602179322958970783.post2816836122012247760..comments2024-03-26T04:41:21.730-07:00Comments on GWSR S&T: The Stools March OnMike Shttp://www.blogger.com/profile/10500618262437555029noreply@blogger.comBlogger4125tag:blogger.com,1999:blog-7602179322958970783.post-3229338419299853452018-03-22T08:52:34.787-07:002018-03-22T08:52:34.787-07:00No, the ground frame will continue to be used unti...No, the ground frame will continue to be used until All the electrical and mechanical work is complete. After all the point rodding and signal wires are in there is still a mountain of work to do ie track bonding, cabling, installing all the block shelf instruments and wiring, etc so our objective is to have the signal box officially commissioned for the start of the 2019 season.<br />The removal of the ground frame will probably be one of the final tasks and will involve the installation of a detector unit to safeguard the points.<br />Thanks for your continued interest and encouragement. <br />PS Had a great ride into Broadway yesterday on one of the Volunteer Specials and the ground frame operated flawlessly and we didn't suffer any de-railments!! Curlyhttps://www.blogger.com/profile/03544397700714608248noreply@blogger.comtag:blogger.com,1999:blog-7602179322958970783.post-36149940245440171092018-03-22T08:25:54.632-07:002018-03-22T08:25:54.632-07:00Great work, S&T. I love your blog. All that...Great work, S&T. I love your blog. All that rodding looks daunting, but you seem to have things under control.<br /><br />It's great work that you do, and I'm sure Lord Faulkner would agree.<br /><br />Go to it, gentlemen !<br /><br />PeterPeterHWrighthttps://www.blogger.com/profile/16495198265526743106noreply@blogger.comtag:blogger.com,1999:blog-7602179322958970783.post-9826765692587781902018-03-22T07:48:07.704-07:002018-03-22T07:48:07.704-07:00These item of news are the ones left out by other ...These item of news are the ones left out by other railways and it makes all the difference to see the ancillary items all coming together. <br />When the rodding reaches the turnout, will it be connected and thus be controlled from the box instead of the ground frame, or will it be put on hold until you have all the point work ready for connection?<br />Regards, Paul.St Blazey 1925https://www.blogger.com/profile/16697444840076235191noreply@blogger.comtag:blogger.com,1999:blog-7602179322958970783.post-58782813078213191612018-03-22T05:57:21.054-07:002018-03-22T05:57:21.054-07:00A good little production line of boxes there! We h...A good little production line of boxes there! We have faith that it will all be up and running at Broadway, sometimes it is these little jobs that take time but suddenly you will have it all finished and tested and wonder what the panic was all about! Great work there every one.<br />Regards<br />Paul & MarionPaul & Marion Sucksmithhttps://www.blogger.com/profile/15384367780051937185noreply@blogger.com